Put two siding bids
on the same page.

Enter real proposal amounts, add the required work each leaves out, and keep a planning reserve separate. Your entries stay in this browser page.

Your proposal figures

USD. Only add known required omissions. An unresolved cost is not zero; obtain clarification before comparing.

Proposal A

Proposal B

Your assumption, applied to each adjusted known total. No default reserve is recommended. Do not duplicate an allowance already included in the bid.

Your comparison

Adjusted known scope

Proposal A—
Proposal B—

Enter both proposal amounts to compare.

With your planning reserve

A reserve—
A planning total—
B reserve—
B planning total—

Formula: base bid + known required omissions = adjusted known scope. Reserve = adjusted known scope × your percentage.

This compares entered amounts only. It does not establish technical equivalence, a contractor quote, hidden-damage cost or an association assessment.

Before the lower total influences your decision

Confirm the product, quantities, removal, wall repair process, flashings, trim, access, protection and approvals are comparable. A missing detail cannot be repaired by arithmetic. Resolve scope gaps and record the source of each adjustment.

How the hypothetical example works

Proposal A: $180,000 base + $20,000 known omissions = $200,000. Proposal B: $195,000 base + $0 known omissions = $195,000. B is $5,000 lower for that assumed known scope. The example loads a 0% reserve; it is not a local price benchmark or suggested budget.

Read the complete budget methodology and closeout requirements. Condo boards should obtain the appropriate review before approving funding or contracts.